February
- Ceiling tile replacement – women’s restroom common area.
- Quarterly fire alarm inspection (horns will sound)
- Baker roof top unit – February 10th tentative start date
- Test all emergency lights (excluding those connected to the generator)
- Test exit signs (all buildings)
- Finalize Forbes fire panel project
March
- Being Park Mill elevator modernization project
- Baker Mill boiler replacement estimate start
- Update lights for daylight savings (March 9th)
- Begin testing and inspecting kitchen exhaust fan switches in Baker
- Remove snow removal stakes
April
- Turn off vestibule heaters (weather permitting)
- Patio Furniture Returned (may be earlier weather permitting)
- Spring Cleanup – Landscape
- No mowing front lawn due to Landscape Committee plantings
- Irrigation turn on
- Spring Changeover HVAC – We are working with the heat pump committee to see if it is possible to make changes in the changeover procedure for Park Mill and Forbes to limit the amount of sediment that goes through the pipes.